Progress Report Week 5.
 
 
Week 5 has seen the shuttering of the beams and pile caps, ready for grouting and also the casting of the lift pit.
 
Beams shuttered.
 

Finished beams.

 
 
The ground workers have also returned to site and have begun to backfill around the perimeter of the buildings, ready for the installation of the floors next week.


Progress Update

Progress Report Week 4.
 
During week 4 the piles have been cropped to the correct levels and the installation of the pile caps has commenced along with reinforced concrete beams.
 
Piles cropped.
 

Pile caps fitted.



 
Reinforced concrete beams installed.
 
 
 

Progress Update

Progress Report Week 3.
 
During this week the piling works have continued without any issues and there has been no significant movement on the railway lines.
 
The piles on the bungalow are complete and the beam installation team have arrived on site.
 
 
Video of installation of piles.
 

 


The piling rig has now completed all of its work and has left site. Thankfully we have had no complaints about noise or vibrations during this period.


 

Progress Update

Progress Report Week 2.
 
The second week of works has comprised of the continuation of the reduced dig, the installation of the piling mat, the site cabins have been setup and the piling rig has arrived on site.
 
The arrival of the piling rig drew a large crowd of residents to gather, due to the large size of it all 38 tonnes and the small access in which it had to be driven through.
 
The pictures below give you some idea of the size of the piling rig.
 


The piling mat has now been completed and the piling works have commenced. Due to the railway line being next to the site Network Rail are on site and track monitoring is in operation, to ensure there is no movement on the railway lines.





The pictures below show the first of many piles installed and the piling rig in operation.
 




Progress Update

PROGRESS REPORT WEEK 1.
 
The first week of the project entailed the removal of fly tipped rubbish, general site clearance, the erection of the perimeter fencing, reduced dig and commencement of the piling mat.
 
The pictures below show what the site looked like at the start and the progress made so far.
 
 



Reduced dig begins.


Commencement of the piling mat